Backfill continues in the front of the building, along with preparations for re-grading part of the parking lot.  Some soil issues have arisen between the Discipleship Building and the Christian Ministry Center, which will require remediation.  Also, the basement level plumbing rough in is nearing completion and preparations are being made to pour the concrete floor.