October 11, 2014

Many of the large roof trusses are up, which gives a great idea of the roofline.  The concrete on the main floor is complete.  We’re waiting on drier weather to finish the pour in the lower level.  Steel studding should begin in the near future.  Also, new shingles will be installed on both existing buildings in concert with the new roof on the discipleship building.